Company Profile
Dongguan Haide Machinery CO.,LTD is located in Guangdong Province---a central manufacturing city of China.Long reach can be widely used for dredging river,port construction,subway construction,digging of foundations and so on.As No.1 Excavator special boom manufacturer in China,We are the only company in China who can produce all brands excavator long reach boom & arm,The biggest long reach we have ever produced is 32meters long reach boom for Hitachi EX1200-6 Excavator .
Specifications and Standard Supply
Working dimensions :
|
Excavator tonnage |
Ton |
20-25ton |
30-36ton |
40-47ton |
|
Total length |
mm |
15400 |
18000 |
18000 |
20000 |
22000 |
20000 |
22000 |
24000 |
A |
Max digging radius |
mm |
15000 |
17300 |
17300 |
19200 |
21020 |
19200 |
21020 |
23020 |
B |
Max digging depth |
mm |
10300 |
12100 |
12100 |
14000 |
15410 |
14000 |
15410 |
16410 |
C |
Max digging depth vertically |
mm |
9400 |
11200 |
11200 |
13100 |
15520 |
13100 |
14520 |
15520 |
D |
Max digging height |
mm |
12800 |
15300 |
15300 |
16600 |
17170 |
15600 |
16170 |
17170 |
E |
Max unloading height |
mm |
10200 |
12200 |
12200 |
13500 |
14830 |
13700 |
14920 |
15630 |
F |
Min rotate radius |
mm |
4720 |
5100 |
5100 |
6200 |
6200 |
6200 |
7740 |
7740 |
|
Boom length |
mm |
8600 |
10000 |
10000 |
11000 |
12000 |
11000 |
12000 |
13000 |
|
Arm length |
mm |
6800 |
8000 |
8000 |
9000 |
10000 |
9000 |
10000 |
11000 |
|
Arm max cut force(ISO) |
KN |
82 |
64 |
115 |
94 |
78 |
167 |
138 |
109 |
|
Bucket max cut force |
KN |
151 |
99 |
151 |
151 |
151 |
151 |
151 |
151 |
|
Bucket capacity |
cbm |
0.5 |
0.4 |
0.9 |
0.7 |
0.5 |
1.0 |
0.8 |
0.6 |
|
Bucket rotate degree |
deg |
170 |
170 |
170 |
170 |
170 |
170 |
170 |
170 |
|
Folding length |
mm |
12600 |
14300 |
14300 |
15300 |
16960 |
15300 |
16960 |
17960 |
|
Folding height |
mm |
3340 |
3480 |
3545 |
3570 |
3670 |
3670 |
3670 |
3670 |
|
Extra counter weight |
ton |
0 |
2 |
0 |
3 |
3.5 |
2 |
3 |
3.5 |
Features:
1.)Material:
We use high Strength Q690D Steel for entire boom and arm (strength :690Mpa,as same as Wledox700 in Europe ) ,Pls see attached Mill's Test Certificate for Q690D steel.
2.)Internal view(spaced by vertical and horizontal reinforcement plate at regular interval)
3.)All steel plate are beveled by beveling machine before welding.
4.)Strong Welding:
A,)Multi-layer welding for the main stressed area.
B.)Welded with mixed gas between argon and carbon dioxide. Argon content:80%.Carbon dioxide content:20%.
C.)all of big welding lines by the robotic machine.

5.)Boring after welding :
To achieve higher machining accuracy, we fixing a 30m boring machine which used to process larger diameter pin hoses after welding, it can meet the demand of micro meter accuracy .
6.)Pins:
All of our pins are hardened (to enhance hardness), tempereded(to enhance toughness) and grinded .So our pins costing is very high and we never had problem with our pins.
8.)The bucket cylinder :
We customized from S-ANY Company .So the quality of bucket cylinder is very reliable .and The High pressure hoses we use American"EATON"brand .
10.)The painting : use"JOTUN" paint ,they are the supplier of the excavator factory ,like HITACHI ,KOBELCO and so on , we can insure the color 100% match with original machines' color,and making sure our paint does not fade during long time use .